CASE STUDY

LA Multi-Family: Vallum Living Wall

200 sq ft Courtyard Transformation

CommercialLiving WallsLos Angeles, CA1 day
200 sq ft Vallum FRX artificial living wall in Los Angeles courtyard
View Gallery
SEC.01 OVERVIEW

Faced with a large, unattractive blank wall in a central courtyard, a Los Angeles building owner sought beautification without maintenance burden. Geranium Street installed a 200 sq ft UV-resistant, irrigation-free Vallum FRX artificial living wall in just one day.

200 sq ft
Size
1 Day
Timeline
Vallum FRX
Product
UV-Resistant
Material
SEC.02 THE CHALLENGE

The Challenge

A large, blank concrete wall in the building's central courtyard served as a visual dead zone. Traditional living walls were ruled out due to irrigation costs, maintenance labor, and plant replacement needs. The client needed a solution that could withstand harsh sun without fading.

SEC.03 OUR SOLUTION

Our Solution

We proposed our flagship Vallum FRX Artificial Living Wall system—ultra-realistic foliage crafted from UV-resistant polymers with irrigation-free design. Our design team curated a plant palette providing depth, variation, and a naturalistic look.

  • UV-resistant materials
  • Irrigation-free design
  • Vallum FRX system
  • Single-day installation
SEC.04 IMPLEMENTATION

Implementation

Our team pre-fabricated all Vallum FRX panels off-site for a perfect fit. On installation day, the skilled crew prepared the wall surface and assembled the modular panels seamlessly. The entire 200-square-foot transformation was completed in a single day.

Detail of Vallum FRX panel installation
Detail of Vallum FRX panel installation
SEC.05 RESULTS

The Results

The courtyard was reborn with a focal point of enduring beauty. Residents and management immediately praised the new space. The UV-resistant materials guarantee the installation will look as vibrant years from now as it did on day one.

Geranium Street delivered exactly what we needed: immediate impact with zero future hassle. Our courtyard went from an afterthought to the building's main talking point in less than 24 hours.
Building OwnerLos Angeles

Project Details

Location
Multi-Family Building, Los Angeles, CA
Industry
Commercial
Type
Living Walls
Completed
January 2026
Timeline
1 day

Start Your Project

Ready to transform your space with premium artificial greenery?

← View All Projects